科學園製冷系統全面分析 • 11個文件夾 • 48個檔案 • 2.1M+ 數據記錄

數據來源: SynologyDrive/06_Project/2026/Science Park • 排除 /report • 2026-09-02

峰值冷負荷
28.88 MW
2025年9月
年能耗
21.9 GWh
13W + 7W 合計
最佳 COP
10.4
B13 CH-07
預計節省
17 %
新 Carrier 19DV
BMS 監控點
17,611
14 建築系統
覆蓋建築
17
7W–22E

📈 2025 每月冷負荷趨勢 (kW)

⚡ 制冷機 COP 對比 (2025)

🔌 13W vs 7W 能耗分布 (M kWh)

📋 BMS 點製摘要

IBMS Point Schedule & DDC Schematic for SPX2

128 points across 9 Crestron DIN controllers

Signal types: 62 AI46 BI16 BO4 AO

Systems: B12W chilled water pumps, heat exchangers (HX-12W-B01 to B04), building water valves, bypass

Notable: 29% spare capacity (37/128 points)

IBMS Point Schedule for 6W, Ph2 to Ph3

2,298 pagesCombined BMS O&M manual + Detailed Interface Documents

17,611 parsed DID points across 14 building systems

SystemPagesPointsProtocols
LVSB/Generator/AHF/UPS389–7357,548Modbus, BACnet/IP
HVAC VAV and FCU1,366–1,6056,433BACnet, LonWorks
HVAC AHU/PAU/Air Side955–1,3651,211BACnet, TCP/IP
HVAC Chiller Plant869–95490RS-485
Lift & Escalator1,647–1,666222Modbus
Security/Smart Card1,741–1775436TCP/IP
Landlord Lighting1,606–1646208BACnet

🖥️ BMS 屏幕截圖分析

Real-time Chiller Plant Screenshots

17 PNG screenshots from BMS interface covering 17 buildings/sub-systems

Date range: 2026-08-24 to 2026-08-25

BuildingTypeTemp Range (°C)Power (kW)Alarms
13WChiller Plant28.4–35.92,716.7Pre/High/Low Temp
7WChiller Plant0.0–34.22,263 / 11,487Pre/High/Low Temp
10W-B16Pump7.4–15.014 alarms
10W-B17Pump13 alarms
11WPump8.4–14.210 alarms
12EPump8.7–14.311 alarms
12WPumpVSD Fault
15WSecondary30–13,007Normal

Overall aggregates: Temp range 0.0–39.9 °C (n=178) • Pressure 0.0–846.5 kPa (n=151) • Flow 0.0–528.2 L/s (n=56)

📊 冷卻水泵趨勢記錄

7W & 13W TrendLog Data

7W&13W_Chiller Water pump_TrendLog.xlsx (12.9 MB, 10 sheets)

Date range: 2025-07-01 to 2026-08-17

7W Chilled Water Pumps

4 pumps (No.4,5,6,7) • Hz, kW, kWh data

Avg Hz: 47.2 (No.4,5) / 22.4–23.0 (No.6,7)

Avg kW: 23.4–29.9 (No.4,5,8) / 71.4–72.4 (No.6,7)

13W Chilled Water Pumps

5 pumps (No.304–308) • Hz, kW, kWh data

Avg Hz: 16.8–27.6 (No.304,305,308) / 9.3–11.6 (No.306,307)

Avg kW: 22.3–35.0 (No.304,305,308) / 69.5–71.5 (No.306,307)

Condenser water pumps: 7W (4 pumps) + 13W (5 pumps) with Hz, kW, kWh data through Aug 2026

🏭 現有設備規格

Chiller Units

7 units per building (B10 & B13)

Model: WCC-10/13-301 to 307

Type: Semi-hermetic centrifugal VSD

Capacity: 3,660 kW (1,040 TR) each

Refrigerant: R134a / R407c

Min COP: 7.133 (NPLV)

Motor: 670 kW • 50 Hz

Cooling Towers

7 units per building (B10 & B13)

Model: CT-10/13-RO1 to RO2

Type: Crossflow

Heat rejection: 4,450 kW each

Condensing water flow: 390 L/s

Ambient wet bulb: 29°C

⚡ COP 能效對比 (2025 vs 2026)

2025 Full Year

35,039 records • 14 chillers (B10 & B13, CH-01 to CH-07)

ChillerRuntime %Mean COPMax COP
B10 CH-0147.8%3.847.54
B10 CH-0344.8%4.299.69
B10 CH-0612.4%10.26154.8
B10 CH-0716.1%9.92201.9
B13 CH-0137.2%4.0917.42
B13 CH-0422.1%4.769.86
B13 CH-0719.4%10.436,552

Building avg COP: B10: 3.4–8.4 • B13: 3.6–9.8 (seasonal variation)

2026 (Jan–Dec partial)

16,849 records • 16 chillers (B10/B13 CH-01 to CH-08)

Key changes from 2025:

New chillers: B10 CH-08, B13 CH-08 added

B10 CH-01/02/03: Zero efficiency readings (possibly not running)

B10 CH-06/07: Now running 88% of time at COP 8.9–9.2

B13 CH-07: Running 99% of time at COP 8.65

2026 Jan avg: B10 COP 9.33 • B13 COP 8.06

🔌 kWh 能耗摘要

13W DCS Plant

Period: 2025-06-01 to 2026-05-31

Total: 12,588,533 kWh

Peak 30-min: 2,234 kWh

Monthly avg: 1,048,211 kWh

Top consumers: TC3 (3.34 GWh) • TC2 (2.83 GWh) • TD2 (1.30 GWh)

7W DCS Plant

Period: 2025-06-01 to 2025-12-07

Total: 9,339,198 kWh (partial year)

Peak 30-min: 2,301 kWh

Monthly avg: 1,334,171 kWh (Jun–Sep)

Top consumers: TD3 (1.67 GWh) • TD1 (1.63 GWh) • TE1 (1.52 GWh)

📐 管道圖則摘要

14 HVAC Schematic Drawings
BuildingSizeTypeStatusContractor
6W3.1 MBWater SideChina Zhejiang Construction
10W3.6 MBWSP / Yau Lee
11W2.3 MBAS-FITTEDSilvertech E&M
12W2.4 MBAir SideAS-BUILTWSP
16W1.0 MBWater SideAS-BUILT
18E0.8 MBAir SideJ. Roger Preston
20E1.2 MBAir + Water SideATAL Engineering
22E1.5 MBAir + Water SideAS-BUILTATAL Engineering

💧 水側圖則

Existing Chiller Plant

2 drawings: Service Tunnel + Combined As-Fitted

Shows: Chilled water system, condenser water system, pumps, valves, piping

Upcoming New Chiller Plant

Drawing: MEP/AC/TS/19/2 (Tender stage, Feb 2026)

Buildings: Energy Building 7W & 13W

Systems: Chilled water, condenser water, chemical treatment, heating water

Changes: Cooling towers 4→6 per building, pipes black steel→ductile iron

🆕 新建方案 — Carrier 19DV

Carrier 19DV Chiller Bulk Purchase

Project: DCS Improvement Work (IW1B) — Chiller Bulk Purchase at 7W and 13W

Contractor: Carrier Hong Kong Limited • Consultant: WSP (Asia) Ltd

Equipment Specs

Model: 19DV-M64M645845F9

Quantity: 14 units (min), 12 assumed for simulation

Capacity: 1,165 TR (4,097 kW) each

Type: Water-cooled hermetic centrifugal with VFD

Refrigerant: R-1233zd(E) (GWP ~1)

Full-load COP: 6.28 • IPLV COP: 12.39

Motor: 652 kW, 5,500 rpm, VFD soft start

Energy Savings

Annual cooling load: 153 GWh

Existing annual cost: $25.8M USD

New annual cost: $21.5M USD

Savings: $4.39M USD/year (17%)

Chiller energy savings: 21%

Per-chiller savings: 29%

Plant capacity: 16,300 TR duty + 2,100 TR standby

📝 七項關鍵發現